{"id":1598,"date":"2025-05-23T05:19:37","date_gmt":"2025-05-23T05:19:37","guid":{"rendered":"https:\/\/strange-margulis.85-215-33-73.plesk.page\/?p=1598"},"modified":"2025-05-23T06:53:08","modified_gmt":"2025-05-23T06:53:08","slug":"advanced-ventilation-ac-system-for-medical-research-facility","status":"publish","type":"post","link":"https:\/\/w-drei.ch\/de\/advanced-ventilation-ac-system-for-medical-research-facility\/","title":{"rendered":"Fortschrittliches L\u00fcftungs- und Klimasystem f\u00fcr medizinische Forschungseinrichtung"},"content":{"rendered":"<p><strong><strong>Basel, Schweiz<\/strong><\/strong><\/p>\n\n\n\n<p>Dieses Projekt umfasste die Planung und Umsetzung eines fortschrittlichen L\u00fcftungs- und Klimasystems f\u00fcr eine f\u00fchrende medizinische Forschungseinrichtung in Basel.\nAuf einer Fl\u00e4che von 2.044 m\u00b2 und innerhalb von nur 120 Tagen realisiert, sorgt das System f\u00fcr eine optimierte Innenraumluftqualit\u00e4t \u2013 entscheidend f\u00fcr sensible Forschungsumgebungen. Mit der Einstufung in die Energieeffizienzklasse A leistet die L\u00f6sung einen Beitrag zu langfristiger Nachhaltigkeit und hoher Betriebssicherheit.<\/p>\n\n\n\n<p><strong>2.045 m\u00b2<\/strong>                <\/p>\n\n\n\n<p><strong>120 Tage<\/strong><\/p>\n\n\n\n<p><strong>Optimierte Luftqualit\u00e4t<\/strong>           <\/p>\n\n\n\n<p><strong>Energieeffizienzklasse A<\/strong><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Basel, Switzerland This project involved the design and implementation of an advanced ventilation and air conditioning system for a leading medical research facility in Basel. Covering 22,000 sq ft, it was executed in just 120 days. The system ensures optimized indoor air quality essential for sensitive research environments. Achieving Energy Efficiency Class A, the solution [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1609,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,13,14,17,15,16,11],"tags":[26,18,20],"class_list":["post-1598","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-education-research","category-health-and-care","category-hospitality-industry","category-power-plants","category-sports-and-leisure","category-traffic-facilities-road-construction","category-work","tag-completed","tag-heating-cooling","tag-ventilation"],"_links":{"self":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1598","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/comments?post=1598"}],"version-history":[{"count":2,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1598\/revisions"}],"predecessor-version":[{"id":1601,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1598\/revisions\/1601"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/media\/1609"}],"wp:attachment":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/media?parent=1598"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/categories?post=1598"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/tags?post=1598"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}