{"id":1602,"date":"2025-05-23T05:29:09","date_gmt":"2025-05-23T05:29:09","guid":{"rendered":"https:\/\/strange-margulis.85-215-33-73.plesk.page\/?p=1602"},"modified":"2025-05-23T07:17:51","modified_gmt":"2025-05-23T07:17:51","slug":"integrated-sanitary-medical-tech-systems-for-surgical-centerresearch-facility","status":"publish","type":"post","link":"https:\/\/w-drei.ch\/de\/integrated-sanitary-medical-tech-systems-for-surgical-centerresearch-facility\/","title":{"rendered":"Integrierte Sanit\u00e4r- und Medizintechniksysteme f\u00fcr chirurgisches Zentrum"},"content":{"rendered":"<p><strong><strong>Bern, Schweiz<\/strong><\/strong><\/p>\n\n\n\n<p>In Bern haben wir ein integriertes Sanit\u00e4r- und Medizintechniksystem f\u00fcr ein modernes chirurgisches Zentrum entwickelt und installiert. Auf einer Fl\u00e4che von 1.533 m\u00b2 und innerhalb von 135 Tagen verbessert die L\u00f6sung das hygienische Wassermanagement und erf\u00fcllt strenge medizinische Standards. Die Integration intelligenter \u00dcberwachungstools gew\u00e4hrleistet einen sicheren und effizienten Betrieb. Dieses Projekt unterst\u00fctzt sowohl die Patientensicherheit als auch die Nachhaltigkeit der Einrichtung.<\/p>\n\n\n\n<p><strong><strong>1.530 m\u00b2<\/strong><\/strong><\/p>\n\n\n\n<p><strong><strong>135 Tage<\/strong><\/strong><\/p>\n\n\n\n<p><strong><strong>Hygienisches Wassermanagement<\/strong><\/strong><\/p>\n\n\n\n<p><strong><strong>Medizinische Normkonformit\u00e4t<\/strong><\/strong><\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Bern, Switzerland In Bern, we developed and installed an integrated sanitary and medical technology system for a modern surgical center. Spanning 16,500 sq ft over 135 days, the solution enhances hygienic water management and complies with strict medical-grade standards. The integration of smart monitoring tools ensures safe and efficient operation. This project supports both patient [&hellip;]<\/p>","protected":false},"author":1,"featured_media":1614,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[12,13,14,17,15,16,11],"tags":[26,18,20],"class_list":["post-1602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-education-research","category-health-and-care","category-hospitality-industry","category-power-plants","category-sports-and-leisure","category-traffic-facilities-road-construction","category-work","tag-completed","tag-heating-cooling","tag-ventilation"],"_links":{"self":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/comments?post=1602"}],"version-history":[{"count":2,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1602\/revisions"}],"predecessor-version":[{"id":1604,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/posts\/1602\/revisions\/1604"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/media\/1614"}],"wp:attachment":[{"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/media?parent=1602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/categories?post=1602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/w-drei.ch\/de\/wp-json\/wp\/v2\/tags?post=1602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}